Project: Accelerating Sustainable and Clean Energy Transformation (ASCENT) at Energy Development Corporation Limited (EDCL): (Deadline 10 October 2025)

Project: Accelerating Sustainable and Clean Energy Transformation (ASCENT) at Energy Development Corporation Limited (EDCL): (Deadline 10 October 2025)

Project: Accelerating Sustainable and Clean Energy Transformation (ASCENT) at Energy Development Corporation Limited (EDCL): (Deadline 10 October 2025)

Employer: Energy Development Corporation Limited (EDCL)

Project: Accelerating Sustainable and Clean Energy Transformation (ASCENT)

Funder: World Bank and Asia Infrastrusture Investment Bank

Contract title: Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Burera and Gakenke Districts

Country: Rwanda

Credit No.: 7461 & 7460

RFP No: RW-REG/EDCL-425353-CW-RFP

Issued on: 04/09/2025

  1. The Government of Rwanda has received financing from the World Bank toward the cost of the Accelerating Sustainable and Clean Energy Transformation, and intends to apply part of the proceeds toward payments under the contract for Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Burera and Gakenke Districts. “For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing.”
  2. The Energy Development Corporation Limited (EDCL) now invites sealed Proposals from the interested eligible Applicants for Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Burera and Gakenke Districts in Northern Province of Rwanda (74.5 km and 60.4 km from Kigali, respectively)

a). Bidders must have successfully completed at least two (2) similar contracts for plant design supply and installation works done within the last ten (10) years of similar nature and complexity, each with a value of at least US Dollars Nine million nine Hundred Thousand (9.9 million USD).

b). Minimum average annual turnover of US$ 14.1 million calculated as total certified payments received for contracts in progress or completed, within the last five (5) years.

c). Additional qualification details are provided in the Bidding Documents/ bid datasheet.

3. The procurement will be conducted through international competitive procurement using Request for Proposals (RFP) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”) and is open to all eligible Proposers as defined in the Procurement Regulations.

4. Interested eligible Proposers may obtain further information from Energy Development Corporation Limited (EDCL); procurement@edcl.reg.rw with a copy to erukinirwa@edcl.reg.rw and cuwajeneza@edcl.reg.rw inspect the RFP document during office hours (09:00 AM to 5:00 PM) at the address given below.

5. The RFP Document in English may be purchased by eligible Proposers upon the submission of a written application to the address below and upon payment of a nonrefundable fee of of 50 USD or in a convertible currency. The method of payment will be deposit on the Bank Account N° 1000057734 in USD opened at National Bank of Rwanda in the name of EDCL EAQIP IDA Designated Account, Swift Code: BNRWRWRW. The document will be sent by e-mail.

6. A single-stage, where two envelope RFP process will be used, and the Proposal will consist of (i) the Technical Part, without any reference to prices; and (ii) the Finnacial Part, as detailed in the RFP Document. The Technical and Financial Parts of the Proposals shall be submitted simultaneously in two separate sealed envelopes.

7. The Proposal, both the Technical Part and the Financial Part, must be delivered to the address below on 07/11/2025 at 10:30am (local time). Electronic Procurement will not be permitted. Late Proposals will be rejected. The Technical Part of the Proposals will be publicly opened in the presence of the Proposers’ designated representatives and anyone who chooses to attend at the address below on 07/11/2025 at 11:00am (local time). The Financial Part shall remain unopened and will be held in safe custody of the Employer until the second public opening of the Financial Part, following the evaluation of the Technical Part of the Proposals.

8. All Proposals must be accompanied by a “Proposal Security” of 282,000 USD or in other freely convertible currency.

9. The non-compulsory site visit is scheduled on 9-10/10/2025 and the meeting point is Burera and Gakenke District Office at 11:00 a.m.

10. The pre-bid meeting shall take place on the site at the end of site visit on the same day.

11. Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful Proposer’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the RFP document.

12. The address (es) referred to above is (are):

Energy Development Corporation Ltd

Félix GAKUBA, Managing Director

KN2 ST 3, Nyarugenge District, Kigali City,

P.O. Box 3855 Kigali, Rwanda;Tel.: (250) 787172265,

Kigali City Tower (KCT), 2nd Floor, Procurement Office

Website: www.reg.rw

Sincerely.

Gentille UMUSHASHI

Head Procurement Management Services

Félix GAKUBA

Managing Director





CLICK HERE TO JOIN MUCURUZI.COM WHATSAPP BUSINESS GROUP





Kindly Note

All Jobs and Opportunities Published on mucuruzi.com are completely free to apply. A candidate should never pay any fee during the recruitment Process. Even if mucuruzi.com does its best to avoid any scam job or opportunity offer, a job seeker or an opportunity seeker is 100% responsible of applying at his own risk.
Check well before applying, if you doubt about the eligibility of any offer do not apply and notifie to mucuruzi.com via this email: mucuruzi2016@gmail.com and remember to never pay any fee to have a job or get any opportunity, if you do so, do it at your own risk.








WELCOME TO OUR WHATSAPP GROUP

About The Author

Related posts